Integrating the Last Planner System and Immersive Virtual Reality: Exploring the Social Mechanisms Produced by Using LPS in Projects
Auteur(s): |
Canlong Liu
Vicente A. González Gaang Lee Guillermo Cabrera-Guerrero Yang Zou Roy Davies |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2024, n. 7, v. 150 |
DOI: | 10.1061/jcemd4.coeng-14430 |
- Informations
sur cette fiche - Reference-ID
10784380 - Publié(e) le:
20.06.2024 - Modifié(e) le:
20.06.2024