Integrating Stakeholders’ Priorities into Level of Development Supplemental Guidelines for HBIM Implementation
Auteur(s): |
Junshan Liu
Graham Foreman Anoop Sattineni Botao Li |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Buildings, 14 février 2023, n. 2, v. 13 |
Page(s): | 530 |
DOI: | 10.3390/buildings13020530 |
Abstrait: |
Heritage Building Information Modeling (HBIM) is increasingly utilized to develop accurate and semantic-rich databases for the representation, preservation, and renovation of cultural heritage. A critical factor in successful HBIM delivery is the intended uses of the model, which need to be established by stakeholders at the onset of the program. Despite the greater application of Building Information Modeling (BIM) technologies to HBIM workflows, the discipline continues to lack clarity regarding information requirements from a tenant perspective. The first stage of this research was a review of 26 published HBIM case studies to extract information including HBIM workflows, level of development (LOD) models in the field, and the stakeholders’ participation in the HBIM program. The findings from the case studies conclude that most HBIM methodologies did not seek to understand the needs of assumptive stakeholders and lacked a clearly defined objective. Ten interviews with proprietors of ten different historic courthouses in the southeastern United States were also included in the study, which were used to identify the priorities of HBIM programs from a built heritage stakeholder’s standpoint. These priorities were used in conjunction with reviewed field standards to develop LOD supplement guidelines applicable for HBIM, which were then validated through a case study. The findings of this research conclude that the creation of LOD guidelines for HBIM application is both achievable and advisable, as they allow stakeholders to identify their priorities for HBIM projects. Such guidelines would assist in standardizing the HBIM discipline and disseminating its usefulness to historic building managers. This research also provides standards that allow cultural heritage stakeholders to make informed decisions about potential HBIM programs and maximize the use of resources to implement such programs. Moreover, the methodology implemented in this research offers a valuable example for future studies on HBIM guidelines and regulations. |
Copyright: | © 2023 by the authors; licensee MDPI, Basel, Switzerland. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
24.26 MB
- Informations
sur cette fiche - Reference-ID
10712238 - Publié(e) le:
21.03.2023 - Modifié(e) le:
10.05.2023