Integrating and optimizing quality and client satisfaction in resource constrained time-cost trade-off for construction projects with NSGA-III methodology
Auteur(s): |
Ankit Shrivastava
Mukesh Pandey |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, 24 septembre 2024, n. 8, v. 25 |
Page(s): | 5669-5684 |
DOI: | 10.1007/s42107-024-01137-2 |