Integrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes
Auteur(s): |
Sinasi Bektas
(Ph.D. Student, Dept. of Civil Engineering, Middle East Technical Univ., Ankara 06800, Turkey (corresponding author).)
M. Talat Birgonul Irem Dikmen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, février 2021, n. 1, v. 13 |
Page(s): | 04520037 |
DOI: | 10.1061/(asce)la.1943-4170.0000439 |
- Informations
sur cette fiche - Reference-ID
10580071 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021