An integrated Building Information Modelling, Integrated Project Delivery and Lean Construction Maturity Model
Auteur(s): |
Sara Rashidian
(School of Architecture & Built Environment, Queensland University of Technology, Brisbane, Australia)
Robin Drogemuller (School of Architecture & Built Environment, Queensland University of Technology, Brisbane, Australia) Sara Omrani (School of Architecture & Built Environment, Queensland University of Technology, Brisbane, Australia) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Architectural Engineering and Design Management |
Page(s): | 1-17 |
DOI: | 10.1080/17452007.2024.2383718 |
- Informations
sur cette fiche - Reference-ID
10794730 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024