Infrastructure Project Investment Decision Timing Using a Real Options Analysis Framework with Rainbow Option
Auteur(s): |
Jatupol Siripongvakin
Nathee Athigakunagorn |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, septembre 2020, n. 3, v. 6 |
Page(s): | 04020036 |
DOI: | 10.1061/ajrua6.0001080 |
- Informations
sur cette fiche - Reference-ID
10519304 - Publié(e) le:
10.12.2020 - Modifié(e) le:
19.02.2021