Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom
Auteur(s): |
Pablo Ballesteros-Pérez
Stefan Thor Smith Josephine Gwen Lloyd-Papworth (School of the Built Environment, Whiteknights, Reading, UK) Peter Cooke (School of the Built Environment, Whiteknights, Reading, UK) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, juillet 2018, n. 12, v. 36 |
Page(s): | 666-682 |
DOI: | 10.1080/01446193.2018.1478109 |
- Informations
sur cette fiche - Reference-ID
10611639 - Publié(e) le:
18.06.2021 - Modifié(e) le:
18.06.2021