In-situ methods for the TBM dismantling in a long-distance and deep-buried tunnel: Case study of Xinjiang water conveyance tunnel
Auteur(s): |
Wei-Qiang Xie
Wei-Wei Li Xiao-Li Liu Shao-Hui Tang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, novembre 2022, v. 129 |
Page(s): | 104683 |
DOI: | 10.1016/j.tust.2022.104683 |
- Informations
sur cette fiche - Reference-ID
10691058 - Publié(e) le:
23.09.2022 - Modifié(e) le:
23.09.2022