설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향 (Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects)
Auteur(s): |
Tai-Kyung Kang
Yoo-Sub Lee |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), février 2008, n. 1, v. 8 |
Page(s): | 97-102 |
DOI: | 10.5345/jkic.2008.8.1.097 |
- Informations
sur cette fiche - Reference-ID
10762151 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024