공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안 (Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects)
Auteur(s): |
Seung-Ho Baek
Tai-Kyung Kang Yoo-Sub Lee |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), février 2012, n. 1, v. 12 |
Page(s): | 108-114 |
DOI: | 10.5345/jkibc.2012.12.1.108 |
- Informations
sur cette fiche - Reference-ID
10761830 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024