Imprecise earned duration model for time evaluation of construction projects with risk considerations
Auteur(s): |
Amir Mohammad Hamzeh
Seyed Meysam Mousavi Hossein Gitinavard |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mars 2020, v. 111 |
Page(s): | 102993 |
DOI: | 10.1016/j.autcon.2019.102993 |
- Informations
sur cette fiche - Reference-ID
10409615 - Publié(e) le:
21.01.2020 - Modifié(e) le:
21.01.2020