Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects
Auteur(s): |
Vitaliy Priven
Rafael Sacks |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2016, n. 7, v. 142 |
Page(s): | 04016013 |
DOI: | 10.1061/(asce)co.1943-7862.0001102 |
- Informations
sur cette fiche - Reference-ID
10170419 - Publié(e) le:
07.12.2018 - Modifié(e) le:
07.12.2018