0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Impacts of task interdependence and equivocality on ICT adoption in the construction industry: a task-technology fit view

Auteur(s): (School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing, People’s Republic of China)
(School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing, People’s Republic of China)
ORCID (School of Architecture and Civil Engineering, Xiamen University, Xiamen, Fujian Province, People’s Republic of China)
(School of Urban Economics and Management, Beijing University of Civil Engineering and Architecture, Beijing, People’s Republic of China)
Médium: article de revue
Langue(s): anglais
Publié dans: Architectural Engineering and Design Management, , n. 1, v. 19
Page(s): 1-18
DOI: 10.1080/17452007.2021.2020084
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1080/17452007.2021.2020084.
  • Informations
    sur cette fiche
  • Reference-ID
    10648285
  • Publié(e) le:
    10.01.2022
  • Modifié(e) le:
    20.02.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine