Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
Auteur(s): |
Pramen P. Shrestha
Medya Fathi (Ph.D. Candidate, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2019, n. 3, v. 11 |
Page(s): | 04519010 |
DOI: | 10.1061/(asce)la.1943-4170.0000311 |