The impact of trust and risk perception on contractors' bid/no-bid decision-making in China – a multiple mediation model
Auteur(s): |
Chunmei Wang
SuJuan Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-10-2023-1015 |
- Informations
sur cette fiche - Reference-ID
10797154 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024