The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 1, v. 9
Page(s): 15
DOI: 10.3390/buildings9010015
Abstrait:

The Construction Industry is a complex and fragmented industry worldwide with regards to its supply chain, products, and processes, and is faced with a similar dilemma as faced by manufacturers during its time in past decades. Scope, time, and cost are the triple constraints of project management and leading factors in defining the project performance. Productivity and efficiency of each construction project is measured through its triple constraints, therefore the factors that affect project success are significantly important. Despite the importance of understanding project performance indicators, few empirical studies have been conducted over the last decade in terms of analyzing the factors that determine the performance of high-rise buildings in Engineering, Procurement, and Construction (EPC) projects. Hence, the aim of this paper is to analyze and rank EPC critical activities across large-scale residential construction projects in Iran, by using the TOPSIS method as a multi-attribute group decision-making technique. Results indicate that engineering design, project planning and controls are significant factors contributing to the project performance. In addition, engineering has a pivotal role in project performance and this significance is followed by the construction phase. On the contrary, all believe procurement is more important than Construction phase.

Copyright: © 2019 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10324993
  • Publié(e) le:
    22.07.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine