Identifying and Mitigating the Risks Created by Problematic Clauses in Construction Contracts
Auteur(s): |
Kevin P. Walsh
(Associate Principal, The Holt Group LLC, 1675 Broadway, Suite 2100, Denver, CO 80238.)
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2017, n. 3, v. 9 |
Page(s): | 03717001 |
DOI: | 10.1061/(asce)la.1943-4170.0000225 |
- Informations
sur cette fiche - Reference-ID
10579857 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021