Identification of Ex-ante and Ex-post Transaction Costs in Industrial Construction Engineering Projects
Auteur(s): |
Fábio Bellotti da Fonseca
Rosangela Maria Vanalle João Alberto Camarotto |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, septembre 2018, n. 5, v. 24 |
Page(s): | 424-436 |
DOI: | 10.3846/jcem.2018.5199 |
- Informations
sur cette fiche - Reference-ID
10354205 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019