Identification and Prevention of Unbalanced Bids Using the Unascertained Model
Auteur(s): |
Xiaowei An
Huimin Li Jian Zuo Omoleye Ojuri Zhuofu Wang Jiyong Ding |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2018, n. 11, v. 144 |
Page(s): | 05018013 |
DOI: | 10.1061/(asce)co.1943-7862.0001563 |
- Informations
sur cette fiche - Reference-ID
10174843 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018