A hybrid light GBM and Harris Hawks optimization approach for forecasting construction project performance: enhancing schedule and budget predictions
Auteur(s): |
Mu’taz Abuassi
Bader aldeen almahameed Majdi Bisharah Mo’ath Abu Da’abis |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, novembre 2024, n. 2, v. 26 |
Page(s): | 577-591 |
DOI: | 10.1007/s42107-024-01207-5 |
- Informations
sur cette fiche - Reference-ID
10815289 - Publié(e) le:
03.02.2025 - Modifié(e) le:
03.02.2025