How to find the optimal time for contractor involvement in infrastructure projects?
Auteur(s): |
Nadina Memić
Allen Tadayon Tausif Ahmed Ishtiaque Ole Jonny Klakegg Paulos Abebe Wondimu Ola Lædre |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-05-2023-0508 |
- Informations
sur cette fiche - Reference-ID
10811819 - Publié(e) le:
17.01.2025 - Modifié(e) le:
17.01.2025