A holistic review of research studies on financial risk management in public–private partnership projects

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 9, v. 28
Page(s): 2549-2569
DOI: 10.1108/ecam-02-2020-0103
Abstrait:

Purpose

Globally, the management of financial risks has gained much attention in the public–private partnerships (PPP) market in recent years. Existing studies rank financial risks among the topmost risk factors that determine the success or failure of a PPP project. As essential for managing financial risks, a systematic review of previous studies on financial risk management of PPP from 1995 to 2019 (inclusive of both years) has been presented in this paper.

Design/methodology/approach

The paper undertakes a systematic analysis of 49 relevant and available studies on financial risk management of PPP projects.

Findings

From the results, high-interest charges, increased construction costs and increased market risks are some of the key financial risks hampering the success of PPP projects. Techniques used to assess financial risks include Monte Carlo Simulation (MCS) and Net Present Value (NPV). Financial risks control adopted by project managers include minimum revenue guarantee and real option pricing. Extremely limited studies on financial risk management in PPP projects in developing economies was revealed.

Practical implications

Project managers in developing financial risk management models may use the outcome of this paper to improve the financial success of PPP projects. Holistically, researchers will be guided to investigate and heighten the pertinent issues on financial risk management of PPP projects in academia.

Originality/value

The results provide a rare guide to project managers in controlling financial risks of PPP projects which is an unexplored topic. It is also the first paper to highlight the issues of financial risk management in PPP projects research.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-02-2020-0103.
  • Informations
    sur cette fiche
  • Reference-ID
    10577096
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    29.11.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine