A high resolution detection approach combining probe drilling and horizontal cross-hole resistivity tomography to interpret water conducting channels ahead of the tunnel: A case study in Yunnan, China
Auteur(s): |
Lichao Nie
Shixun Jia Zhi-qiang Li Qian Guo Tingyi Wang Yuchao Du Shimin Li Pengyu Jing |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering Geology, mars 2024, v. 331 |
Page(s): | 107449 |
DOI: | 10.1016/j.enggeo.2024.107449 |
- Informations
sur cette fiche - Reference-ID
10776593 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024