High Leys service reservoir: a semi-precast construction
Auteur(s): |
Navdeep Aujla
(Chartered Civil Engineer, Mott MacDonald, Cambridge, UK (corresponding author: ))
Mark Edmondson (Principal Geotechnical Engineer, Mott MacDonald Bentley, Skipton, UK) Mike Dixon (Reservoir Supervising Engineer, United Utilities, Warrington, UK) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Dams and Reservoirs, décembre 2021, n. 4, v. 31 |
Page(s): | 1-7 |
DOI: | 10.1680/jdare.21.00029 |
- Informations
sur cette fiche - Reference-ID
10636940 - Publié(e) le:
30.11.2021 - Modifié(e) le:
18.12.2021