Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach
Auteur(s): |
Cheng Fan
Deng Binchao Yilin Yin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mai 2022, n. 7, v. 30 |
Page(s): | 2991-3013 |
DOI: | 10.1108/ecam-09-2021-0785 |