Groundwater lowering for construction of the Kilsby Tunnel – pumping and tunnelling
Auteur(s): |
Mike Chrimes
(ICE Panel for Historical Engineering Works, London, UK)
Martin Preene (Richter Associates, Huddersfield, UK) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, 1 novembre 2022, n. 4, v. 175 |
Page(s): | 1-21 |
DOI: | 10.1680/jenhh.21.00009 |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10647865 - Publié(e) le:
10.01.2022 - Modifié(e) le:
10.12.2022