Generating Labour Cost Budget for a Construction-Oriented Fabrication Facility: Simulation-based Resource Scheduling Approach
Auteur(s): |
Leila Zahedi
(University of Alberta Faculty of Engineering, 120449, Civil and Environmental Engineering, Edmonton, Alberta, Canada, T6G 2V4;)
Ming Lu (University of Alberta, Dept. of Civil and Environmental Engineering, Markin/CNRL Natural Resources Eng. Facility, Edmonton, Alberta, Canada, T6G 2W2, ;) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, juin 2022, n. 6, v. 49 |
Page(s): | 1-16 |
DOI: | 10.1139/cjce-2020-0429 |
- Informations
sur cette fiche - Reference-ID
10636139 - Publié(e) le:
30.11.2021 - Modifié(e) le:
02.06.2022