Fuzzy Estimation Of Activities Duration In Construction Projects
Auteur(s): |
N. Ibadov
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Archives of Civil Engineering, juin 2015, n. 2, v. 61 |
Page(s): | 23-34 |
DOI: | 10.1515/ace-2015-0012 |
Abstrait: |
During implementation of construction projects, durations of activities are affected by various factors. Because of this, both during the planning phase of the project as well as the construction phase, managers try to estimate, or predict, the length of any delays that may occur. Such estimates allow for the ability to take appropriate action in terms of planning and management during the execution of construction works. This paper presents the use of the non-deterministic concept for describing the uncertainty of estimating works duration. The concept uses the theory of fuzzy sets. The author describes a method for fuzzy estimations of construction works duration based on the fact that uncertain data is an inherent factor in the conditions of construction projects. An example application of the method is presented. The author shows a fuzzy estimation for the duration of an activity, taking into consideration the distorting influence caused by malfunctioning construction equipment and delivery delays of construction materials. |
- Informations
sur cette fiche - Reference-ID
10476902 - Publié(e) le:
25.11.2020 - Modifié(e) le:
25.11.2020