Full-Scale Implementation and Testing of Full-Depth Precast Bridge Deck Panels
Auteur(s): |
David M. Mante
Hassan H. Abbas George E. Ramey Robert W. Barnes |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Transportation Research Record: Journal of the Transportation Research Board, janvier 2015, n. 1, v. 2522 |
Page(s): | 3-17 |
DOI: | 10.3141/2522-01 |
Abstrait: |
A bridge deck panel system using nonprestressed full-depth precast concrete bridge deck panels with continuous shear pockets was investigated. First, the research team performed conceptual improvement, design, detailing, and fabrication studies on a specific deck replacement system (System CD-2) previously proposed by NCHRP Project 12-65 researchers. Key improvements to the CD-2 deck panel system included modifications to the transverse joint coupler for ease of construction and the addition of a longitudinal staged-construction joint to expedite bridge deck replacement projects. Next, an experimental program was carried out to construct and perform service-level load testing on a full-size precast deck panel assemblage that incorporated the refinements. On the basis of static and cyclic loading test results, it was found that the modified CD-2 deck panel system as a whole performed satisfactorily with regard to AASHTO serviceability requirements. |
- Informations
sur cette fiche - Reference-ID
10778042 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024