Formulation of parameter limit values for the operation of a large concrete gravity dam

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 1276
Page(s): 012009
DOI: 10.1088/1757-899x/1276/1/012009
Abstrait:

This study presents a coupled thermal-structural finite element analysis of a large concrete gravity dam in Bulgaria for exploring the dam response under different actual load combinations. The loads applied to the structure are caused by varying water level in the reservoir and ambient temperature typical for the respective seasons. The developed computational model was calibrated with real plumb measurements. Based on the performed analyses in the ANSYS environment, key limit values for the horizontal displacements measured by the plumbs in the dam as possibly caused by extreme combinations of ambient temperature and water level are formulated for further improvement of the dam operation.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1757-899x/1276/1/012009.
  • Informations
    sur cette fiche
  • Reference-ID
    10777302
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine