First use of the DYWIDAG MC Strand Post-Tensioning System for external tendons in Germany
Construction of the Wehretal Bridge as part of the A44 motorway, Walburg near Hessisch Lichtenau, Germany
Médium: | article de revue |
---|---|
Langue(s): | anglais |
Publié dans: | DSI Info, 2003- 2004, n. 12 |
Page(s): | 31 |