First application of mechanized method using earth pressure balance TBM with large horseshoe-shaped cross section to loess mountain tunnel: A case study of Baicheng tunnel
Auteur(s): |
Wenge Qiu
Xufeng Ai Yuchao Zheng |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, août 2022, v. 126 |
Page(s): | 104547 |
DOI: | 10.1016/j.tust.2022.104547 |
- Informations
sur cette fiche - Reference-ID
10678446 - Publié(e) le:
18.06.2022 - Modifié(e) le:
18.06.2022