Finance-based scheduling for projects in owners’ portfolios: MILP versus improved GA and PSO
Auteur(s): |
Ali Fares
Ashraf Elazouni Sameh Al-Shihabi Mubarak Al-alawi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2024-0960 |
- Informations
sur cette fiche - Reference-ID
10816637 - Publié(e) le:
03.02.2025 - Modifié(e) le:
03.02.2025