0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1594
Page(s): 140-146
DOI: 10.3141/1594-15
Abstrait:

The objective of the study was to verify the load-carrying capacity of an existing steel girder bridge. The selected structure was a 70-year-old deteriorated bridge in Michigan. The load-carrying capacity of the bridge was in question because of extensive corrosion of the steel girders. An initial rating indicated that the bridge had a marginal operating rating factor for 11-axle two-unit trucks, which are the heaviest vehicles allowed in Michigan. To avoid the load limit posting, it was decided that investigators would verify by nondestructive testing whether the bridge is safe to carry normal truck traffic. The test procedures used on the selected bridge included tests for obtaining stress histogram measurements and weigh-in-motion measurements and a proof load test. The methodology and the results are described.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3141/1594-15.
  • Informations
    sur cette fiche
  • Reference-ID
    10778552
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine