Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation
Auteur(s): |
Abdul Wahab
Jun Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mai 2021, n. 2, v. 29 |
Page(s): | 702-715 |
DOI: | 10.1108/ecam-10-2020-0823 |
- Informations
sur cette fiche - Reference-ID
10603354 - Publié(e) le:
17.04.2021 - Modifié(e) le:
23.03.2022