Factors and Strategies for Improving Construction Management on Sites in Mega-Projects in South Africa: An Explorative Survey

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Infrastructures, , n. 2, v. 7
Page(s): 19
DOI: 10.3390/infrastructures7020019
Abstrait:

Mega-projects, particularly for the development of infrastructure, are being undertaken increasingly in many developing countries. Mega-projects are highly complex and involve significant construction activities. However, mega-projects in Africa face critical challenges of delay and cost overruns because of their nature and the complexities involved. Therefore, using the context of mega-projects in South Africa and stakeholders’ perceptions, the factors that influence construction, and strategies that would alleviate the challenges and improve construction management at sites were examined in this study. Factor analysis and ordinal regression modelling were used to analyse data obtained from a survey conducted among stakeholders. Findings suggested that five principal components and associated factors, including stakeholders, plant and machinery, productivity, workforce and materials, significantly affect construction during mega-projects. Further, eight strategies that are aligned to stakeholder engagement, plants and machinery, productivity, human resources and materials are likely to improve construction management at sites of mega-projects in South Africa. The four most important strategies include making the availability of competent personnel for plant and machinery operation and maintenance, effective supervision and monitoring, the adoption of appropriate stakeholder engagement methods and ensuring transparent and effective engagement, and the implementation of an advanced and effective communication system. Further strategies, such as the identification of stakeholders and common goals and procurement and use of advanced and quality plant and machinery, including the use of robotics and automation, could improve construction at sites. Similarly, strategies such as ensuring availability of adequate and quality material, and management of the site for effective accessibility and operation, although likely to have lesser influence, could also improve construction at sites of mega-projects.

Copyright: © 2022 the Authors. Licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10722925
  • Publié(e) le:
    22.04.2023
  • Modifié(e) le:
    10.05.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine