Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: II. Comparative Analysis and Quantitative C-I-V-I-L Classification
Auteur(s): |
Abdulhamit Kayihan Duzkale
Gunnar Lucko |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, octobre 2016, n. 10, v. 142 |
Page(s): | 04016050 |
DOI: | 10.1061/(asce)co.1943-7862.0001124 |
- Informations
sur cette fiche - Reference-ID
10155093 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018