Exploring Stakeholders’ Perspectives on the Barriers to the Application of Cost-Reduction Techniques in Public Higher Educational Building Delivery

Auteur(s): ORCID


Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 8, v. 14
Page(s): 2551
DOI: 10.3390/buildings14082551
Abstrait:

The assessment of barriers to the application of cost-reduction techniques in delivering educational buildings in Nigeria is essential in addressing the infrastructural shortage, building performance, delay, cost, time overrun, and abandonment in the delivery of higher educational buildings (HEBs). This study examines barriers to applying cost-reduction techniques in educational buildings in southwestern Nigeria. Using a survey design, the questionnaire was distributed to stakeholders who participated in delivering the government intervention, private donors, and internally generated revenue educational buildings in public tertiary institutions in southwestern Nigeria from 2012 to 2022. A total of 150 copies of the questionnaire were administered, while 133 responses were obtained and analyzed. To begin with, data reliability and validity were examined using Bartlett’s sphericity, Cronbach’s alpha, and Kaiser–Meyer–Olkin (KMO) tests, accordingly, followed by descriptive, Kruskal–Wallis H test, and exploratory factor analysis. The six components obtained from exploratory factor analysis for explaining the barriers to applying cost-reduction techniques in educational buildings were as follows: ambiguity in HEB contracts awards and project executions, lack of control from the HEIs management over HEB project delivery, perceived political influence in HEB procurement, unrealistic contract requirements and change orders, non-prioritization of automation integration in HEB delivery, and deficiencies in contract documents and costing. This study recommends establishing a project-monitoring team involving independent consultants from project inception to reduce excessive errors, practices of assigning contracts to the lowest bidder, and excessive claims for variation orders that escalate the project’s final sum.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10795279
  • Publié(e) le:
    01.09.2024
  • Modifié(e) le:
    01.09.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine