Experimental Study on Pile-Soil Interaction Response in Saturated Sand under Long-Term Horizontal Cyclic Loading
Auteur(s): |
Lei Xing
Duoyin Wang Li Wang Meiling Fan Lunliang Duan |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, janvier 2021, v. 2021 |
Page(s): | 1-13 |
DOI: | 10.1155/2021/6627161 |
Abstrait: |
To explore the pile-soil interaction response in saturated sand under long-term horizontal cyclic loading, a series of indoor 1 g model tests were carried out with self-made loading equipment. In this paper, the self-made loading system and test program are introduced firstly. Then, the long-term horizontal cyclic loading-induced pile top cumulative displacement, the rotation angle, the mono-pile horizontal cyclic stiffness, the cyclic p-y curve, the pore water pressure, the soil settlement, and cracks around mono-pile are fully studied. Based on the experimental results, the pile-soil interaction response shows a two-stage characteristic with the change in cycle (N), and the short_term effects of horizontal cyclic loading are greater than the long-term effects. In the first 1000 cycles, the cumulative displacement of pile top, the rotation angle of mono-pile, and the pore water pressure could reach more than 90% of the final value. In addition, the cyclic p-y curve obtained by the test is generally smaller than the p-y curve calculated from the API specification, and the soil near the mono-pile will settle with annular cracks under the cyclic loading. |
Copyright: | © 2021 Lei Xing et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
3.99 MB
- Informations
sur cette fiche - Reference-ID
10602094 - Publié(e) le:
17.04.2021 - Modifié(e) le:
02.06.2021