0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Experimental Study on Base Piles Bearing Capacity of Qilu Yellow River Bridge

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 825
Page(s): 012018
DOI: 10.1088/1755-1315/825/1/012018
Abstrait:

Qilu Yellow River Bridge is located in Jinan City, Shandong Province. The main bridge adopts bored pile foundation with high design bearing capacity. In order to ensure that the bearing capacity of single pile meets the requirements and ensure the safety of the bridge, the double load boxes O-cell test pile method is used to test the bearing capacity of pile before and after grouting. According to the soil layer property around pile, the double load boxes can be loaded optionally and solve the problems in the tradition pile test. The bearing capacity of each pile section is determined. The bearing capacity of pile before grouting is 75255kN, the bearing capacity of pile after grouting is 89100 kN.

License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée.

  • Informations
    sur cette fiche
  • Reference-ID
    10781087
  • Publié(e) le:
    11.05.2024
  • Modifié(e) le:
    11.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine