0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1741
Page(s): 199-206
DOI: 10.3141/1741-28
Abstrait:

The goal of the Heated Bridge Technology Program, established in 1991 under the Intermodal Surface Transportation Efficiency Act, is to find durable and environmentally friendly heated bridge technologies for ice and snow removal. The first heated bridge built in Virginia is evaluated. The bridge is on Route 60 over the Buffalo River in Amherst County. The project was monitored from its construction in 1995 through winter operations terminating in spring 2000. Data were collected remotely using an electronic data logger interfaced with various temperature and environmental sensors. An infrared camera was used to examine heat distribution across the bridge deck. The results of the study demonstrate that heat pipe technology can provide a feasible option for heating decks. However, substantial problems were encountered in getting the system to perform as designed. It appears that the control aspect of this technology requires additional improvements to ensure reliable operation under field conditions.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3141/1741-28.
  • Informations
    sur cette fiche
  • Reference-ID
    10778410
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine