Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry
Auteur(s): |
Malik Lakshan Hasantha
Anuradha Samarajeewa Waidyasekara Hasith Chathuranga Victar |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-11-2023-1151 |
- Informations
sur cette fiche - Reference-ID
10775311 - Publié(e) le:
29.04.2024 - Modifié(e) le:
29.04.2024