Evaluation of practicality of virtual design and construction (VDC) with 5D building information modelling (BIM) through a case study

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 943
Page(s): 012058
DOI: 10.1088/1757-899x/943/1/012058
Abstrait:

Virtual design and construction (VDC) is defined as the use of multi-disciplinary performance models for the purposes of design-construction projects. The use of VDC in construction projects enables the stakeholders to communicate and visualize the buildability and construction sequence which will impact on a project’s success in terms of delivery time and cost. This case study investigated the process of integrating different dimensions of information such as time scheduling (4D) and cost estimation (5D) with a 3D model to simulate a 5D Building Information Modelling (BIM) process. The study explored the application of VDC with 5D BIM for a commercial building, namely Universiti Tunku Abdul Rahman (UTAR) Sungai Long City Campus. Through this case study, it enables comparisons of a virtual model and an actual construction in order to evaluate the advantages, practicality, and limitations of the VDC applications. The 5D model provided comprehensive information to manage the complex design-construction process by considering its timeline and cost. Six modelling stages were undertaken, namely inputting and modelling, clash detection test, time scheduling, quantification and cost estimation, virtualization, and walkthrough of the model. The results revealed that the practicability of the 5D BIM was influenced by the modelling effort, inter-operability, information output and limitations. The study also showed that VDC with 5D BIM significantly reduced the technical barrier for clients to participate in construction project, thus increasing the clients’ satisfaction of the works by bridging the gap of perception and actual outcomes from the construction.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1757-899x/943/1/012058.
  • Informations
    sur cette fiche
  • Reference-ID
    10675033
  • Publié(e) le:
    03.06.2022