Estimating the impact of a new bridge over the river Danube
Auteur(s): |
Adrian Vilcan
Viorel Nicolae Ivana Martin Mihaela Istrate |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Earth and Environmental Science, 1 janvier 2022, n. 1, v. 960 |
Page(s): | 012021 |
DOI: | 10.1088/1755-1315/960/1/012021 |
Abstrait: |
The impact of a new bridge over the Danube was estimated using a 3-step road transport model, as at the time no multimodal model was available. Different forecasts have been considered for both scenarios without the project and with the project. Also, sensitivity tests have been carried out in order to assess the impact of various bridge tolls. At the end, time savings and emissions have been estimated. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée. |
1.12 MB
- Informations
sur cette fiche - Reference-ID
10780739 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024