Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes
Auteur(s): |
Kyuman Cho
Taehoon Kim Taehoon Hong |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Management in Engineering (ASCE), mars 2020, n. 2, v. 36 |
Page(s): | 04019040 |
DOI: | 10.1061/(asce)me.1943-5479.0000732 |
- Informations
sur cette fiche - Reference-ID
10385582 - Publié(e) le:
24.11.2019 - Modifié(e) le:
24.11.2019