Estimated Cost at Completion: Integrating Risk into Earned Value Management
Auteur(s): |
Suqrat Babar
Muhammad Jamaluddin Thaheem Bilal Ayub |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2017, n. 3, v. 143 |
Page(s): | 04016104 |
DOI: | 10.1061/(asce)co.1943-7862.0001245 |
- Informations
sur cette fiche - Reference-ID
10170960 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018