Equipment Combination Model for Effective Excavation Work for Urban High Rise Buildings
Auteur(s): |
Donghoon Lee
Jun-Young Park Sunkuk Kim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Asian Architecture and Building Engineering, mai 2017, n. 2, v. 16 |
Page(s): | 325-332 |
DOI: | 10.3130/jaabe.16.325 |
- Informations
sur cette fiche - Reference-ID
10330712 - Publié(e) le:
28.07.2019 - Modifié(e) le:
28.07.2019