0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Enhancing the value of facilities information management (FIM) through BIM integration

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 4, v. 27
Page(s): 809-824
DOI: 10.1108/ecam-02-2016-0041
Abstrait:

Purpose

Building information modelling (BIM) provides a robust platform for information management in built environment facilities. However, one of the consequences of the limited application of BIM in facilities information management (FIM) is that the potential value gain through the integration of as-built information during the operations management process has had limited exploration in current practice. The purpose of this paper is to explore the potential impact of BIM to enhance the value of FIM.

Design/methodology/approach

A detailed literature review was undertaken to identify BIM application in a construction context, and to develop a framework to investigate the value of information. An interpretative approach was adopted for data collection and analysis. A total of 14 semi-structured interviews were conducted with construction industry professionals to identify how value of FIM can be enhanced through BIM integration. The interview data were analysed using open and selective coding.

Findings

The findings confirm that information exchange between the construction and facilities management (FM) phases of a project are important in terms of efficient and effective maintenance of a facility as well as optimising the design task. With these promising benefits, BIM is an efficient mechanism to facilitate construction information exchange. However, there is an uncertainty over the optimum level of information that ought to be on a BIM model for FM purposes. The relationship between different aspects of value is a starting point to filter the required information for each individual project. In contrast, limited awareness of value of information exchange and the potential of BIM enabled FIM during construction is noted.

Research limitations/implications

The information exchange considered within this investigation was limited to two key phases of the facility life cycle, namely, construction and FM (in-use).

Practical implications

The findings bring insight into an unseen aspect of FM information needs that should be given priority in upcoming BIM developments. Also, it draws attention to how value is concerned in a daily basis beyond monetary terms.

Originality/value

The investigation of value enhancement through BIM integration in particular to FIM and ongoing research with new value dimensions.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-02-2016-0041.
  • Informations
    sur cette fiche
  • Reference-ID
    10576666
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine