Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation
Auteur(s): |
Zhenmin Yuan
Zhiyu Li Zhen Lei Ye Yang Wei Zhang Wanliang Lin Lingzhi Cao |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, février 2025, n. 2, v. 151 |
DOI: | 10.1061/jcemd4.coeng-15470 |
- Informations
sur cette fiche - Reference-ID
10808097 - Publié(e) le:
17.01.2025 - Modifié(e) le:
17.01.2025