Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model
Auteur(s): |
Cen Ying Lee
Heap-Yih Chong Xiangyu Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2018, n. 7, v. 144 |
Page(s): | 06018002 |
DOI: | 10.1061/(asce)co.1943-7862.0001521 |
- Informations
sur cette fiche - Reference-ID
10174785 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018